Electric Starter Installation Check List
Sixth phase, Final steps to complete the installation.
Last updated 11/01/11
This check list will complete the conversion by re-installing all the parts removed in phase one.
We estimate this step will take approximately 4 hours.
Line No.
Description
Check 1
Install the lower shock mounting bolts, but do not tighten.
. 2
Install the chain guard.
. 3
Tighten the lower shock mounting bolts.
. 4
Install the head steady parts that were removed.
Make sure the ground wire is attached to the head steady bolt.
. 5
Place the top two oil tank mounts into the frame.
. 6
Place the oil tank into the frame, but do not fasten the top two mounts.
Attaching the oil lines may be easier if you can jocky the oil tank around.
. 7
Install the oil lines to the oil tank and the oil filter mount, if present.
. 8
Install crank case breather line to the oil tank.
. 9
Tighten all the oil tank mounts.
. 10
Install the rocker feed oil line on the timing case.
. 11
Install the right side rider's peg.
Make sure the ground wire is attached to one through bolt.
. 12
install the kickstart lever on the gearbox.
. 13
install the shift lever on the gearbox.
. 14
Install the two chain tensioner bolts into the swingarm.
. 15
Install the rear sprocket/brake drum.
. 16
Install the rear wheel.
. 17
install the drive chain.
. 18
Adjust the rear chain and the alignment of the rear wheel.
. 19
Install the left side rider's peg.
. 20
Install the left side rider's peg.
. 21
If you have a 750 center stand, drill out the mounting holes to 11/16".
. 22
Install the center stand and spring.
. 23
Add gearbox oil in gearbox.
. 24
Add engine oil in both the engine and the oil tank.
. 25
Remove the bike from the bike stand.
We have to lift a bike on to our bike stand, so we have to do this step before we can install the tank and seat.
. 26
Install the seat and the gas tank.
.